亚洲中文日韩-亚洲中文日韩大片在线观看-亚洲中文日韩国产一区-亚洲中文三级情片在线观看-亚洲中文色欧另类欧美动图-亚洲中文少妇影视

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 16519

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 久久精品国产男包 | 波多野结衣久久精品 | 国产精品人妻一区二区 | 伊人蕉久中文字幕无码专区 | 天天综合免费精品7799视频 | 在线播放最好看的国语电视剧在 | 欧美极品jizzhd欧美4k | 成人欧美一区二区三区在线观看 | 欧美综合区自拍亚洲综合天堂 | 日本特黄群交A片视频 | 久久免费看少妇高潮A片JA小说 | 亚洲国产一区在线 | 日韩一区二区三区视频在线播放 | 精品 在线 视频 亚洲 | 精品久久免费一区二区三区四区 | 在线视 欧美 亚洲日本 | 日日夜夜国产 | 少妇免费毛片久久久久久久久 | 91中文字幕午夜福利亚洲天堂成人国产 | 国内久经典AAAAA片 | 中文字幕二区 | 在线观看日本污污ww网站 | 草草影院国产第一页 | 亚洲av无码男人的天堂在线 | 日韩一区二区三区在线观看 | 一本视频精品中文字幕 | 99久久国产综合精品女不卡 | 中文字幕精品在线视频 | 国产亚洲精品字幕在线观看 | 一区二区日本视频 | 国产精品亚洲片在线va | 亚洲精品国偷拍自产在线 | 亚洲综合色色图 | 日韩欧美三级视频 | 红杏影院永久免费入口 | 国产欧美日韩精品免费看 | 久久免费看少妇高潮A片2012 | 国产人妻黑人一区二区三区 | 黑人大棒日俄罗斯美女 | 制服丝袜长腿无码专区第一页 | 国产成人精品视频VA片 |